S6A

box_112516

Supplies and materials flowing in at a steady rate. Got the next two kits prototyped and spec’d, therefore only needing specimens, photography models, and instructions. Easy-peezey. Mighty progress!

The Argo Wool Works build-in-progress has been moved back up onto the high shelf, to free the work table for kitting, photography and the rest. I’m also putting away the needlepoint frame, and about half a dozen other would-be, want-to-be, once-were projects. Deargod I may even dust.

shelf_112516

So sad.

studio

I’m surprised I get as much done as I do.

b_sharppark_112516

In other news, Brian and I headed out this morning for a beach walk and cleanup. Esplanade had no beach at all because of high surf, so we went to Sharp Park. So very many small bits of styrofoam, plastic bottle caps, straws, and miscellaneous plastic packaging, all washed down to the ocean with the recent rains :(

Still, the waves were booming, and there were many dogs and walkers out. I love the coast in winter.

6 thoughts on “S6A

  1. Sheila says:

    My husband can’t see pictures of Scarlett without going ‘awwww…’

    She must be so happy to have more space to play with on the workbench and thus (to her mind) more of her mommy’s attention.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s